1) 07/020/BK_23/0085 (BK-257/RIB2/2023)
Formation of properties of biomaterials for tissue reconstruction
Implementation time: 01. 01. 2023-31. 12.2023
Project Manager: Prof. Zbigniew Paszenda, D.Sc.
2) AtraymaBioMat. Advanced metamaterials dedicated to cardiovascular surgery to minimize tissue trauma
Implementation time: 07. 2023-06.2026
Project Manager: Marcin Basiaga, Ph.D., Professor of Silesian University of Science and Technology.
The project was funded by the National Center for Research and Development under the M-ERA.NET 3 program.
1) 07/020/NB_22/0084 (NB-303 /RIB2/2022)
Development of technology of an innovative tool for soft tissue musculo-fascial release
Implementation time: 28. 11. 2022-15. 04.2023
Project Manager: Marcin Basiaga, Ph.D., Professor of Silesian University of Science and Technology.
2) 07/020/PBU19/0044 OPUS
Nanometric functionalization of the surface of metallic biomaterials used in the skeletal system
UMO-2018/29/B/ST8/02314
Implementation time: 28. 01. 2019-27. 01.2023
Project leader: Marcin Basiaga, Ph.D., Professor of Silesian University of Science and Technology
Funding: NCN
3) 07/020/NB_22/0080 (NB-156 /RIB2/2022)
Development of a prototype device for precise bending of orthodontic wires
Implementation time: 01. 06. 2022-14. 09.2023
Project manager: Dr. Damian Nakonieczny, Eng.
1) 07/020/SDU/10-22-01
Functionalization of polymers for biomedical applications with compounds with therapeutic effect
DUB20-II edition – Grant to start scientific activity in a new research topic, as part of the Excellence Initiative – Research University program
Delivery time: 27.11.2020-17.05.2022
Project manager: dr inż. Magdalena Antonowicz
2) 07/020/SDU/10-22-02
Investigation of the influence of surface modification of metal biomaterials on bacterial adhesion
DUB20-II edition – Grant to start scientific activity in a new research topic, as part of the Excellence Initiative – Research University program
Delivery time: 27.11.2020-17.05.2022
Project manager: mgr inż. Anna Taratuta
3) 07/020/PBU19/0044 OPUS
Nanometric surface functionalization of metallic biomaterials used in the skeletal system
UMO-2018/29/B/ST8/02314
Delivery time: 28. 01. 2019-27. 01. 2022
Project manager: dr inż. Marcin Basiaga
Financing: National Science Center
4) 07/020/SDU/10-21-01
Limiting peri-implant reactions around implants to treat anterior chest wall deformities through the use of hybrid surface treatment
DUB20-II edition – Grant to start scientific activity in a new research topic, as part of the Excellence Initiative – Research University program
Delivery time: 10. 06. 2020-10. 06. 2022
Project manager: dr inż. Anita Kajzer
5) 07/020/BK_22/0073 (BK-230/RIB2/2022)
Formation of properties of biomaterials for tissue reconstruction
Implementation time: 01. 01. 2022-31. 12. 2022
Project manager: Prof. Zbigniew Paszenda, D.Sc.
6) 07/020/BKM_22/0075 (BKM-532/RIB2/2022)
Surface modification of new generation Ti13Nb13Zr alloy using nanoPVD method
Implementation time: 01. 01. 2022-31. 12. 2022
Project manager: Julia Lisoń, M.Sc.
Funding: Ministry of Science and Higher Education.
7) 07/020/BKM_22/0074 (BKM-531/RIB2/2022)
Mechanical properties of biodegradable polymer coatings containing HAp and active substance applied by ultrasonic method
Implementation time: 01. 01. 2022-31. 12. 2022
Project manager: Karolina Goldsztajn, M.Sc.
Funding: Ministry of Science and Higher Education
8) 07/020/NB_21/0071 (NB-277/RIB2/2021)
Study of the material (Ti6Al4V ELI alloy) used for the manufacture of subperiosteal implants using 3D printing
Implementation time: 02. 11. 2021-15. 04. 2022
Project Manager: Marcin Kaczmarek, Ph.D., Professor of Silesian University of Technology
9) 07/020/NB_22/0078 (NB-134 /RIB2/2022)
Quality assessment of dental wires
Implementation time: 08. 06. 2022-30. 06. 2022
Project Manager: Marcin Basiaga, Ph.D., Professor of Silesian University of Science and Technology
10) 07/020/NB_22/0079 (NB-143 /RIB2/2022)
Performance of studies of carbide blanks for identification of unfavorable surface phenomenon
Implementation time: 15. 06. 2022-01. 07. 2022
Project Manager: Witold Walke, Ph.D., Professor of Silesian University of Technology
11) 07/020/U_22/0077 (U-734 /RIB2/2022)
Electropolishing service of selected components of the implant system
Implementation time: 28. 04. 2022-28. 06.2022
Project Manager: Marcin Kaczmarek, Ph.D., Professor of Silesian University of Technology
12) 07/020/U_22/0082 (U-753 /RIB2/2022)
MicroCT scanning service of four Alex Stratos stents and development of CAD models of four stents
Implementation time: 28. 04. 2022-28. 06.2022
Project manager: Marcin Kaczmarek, Ph.D., professor of Silesian University of Technology
1) 07/020/PBU19/0056
MINIATURE Shaping the physicochemical properties of polymer-ceramic composites with oxide fillers
DEC-2019/03/X/ST5/00042
Delivery time: 09. 10. 2019- 08. 02. 2021
Project manager: dr inż. Damian Nakonieczny
Financing: National Science Center
1) 07/020/BK_20/0059 (BK-251/RIB2/2020)
Shaping properties of biomaterials for tissue reconstruction
Delivery time: 01. 01. 2020-31. 12. 2020
Project manager: prof. dr hab. inż. Zbigniew Paszenda
2) 07/020/BKM20/0060 (BKM-513/RIB2/2020)
Selected physicochemical properties of the DLC coating applied to the Ti-13Nb-13Zr substrate intended for contact with blood
Delivery time: 01. 01. 2020-31. 12. 2020
Project manager: dr inż. Magdalena Antonowicz
Financing: Ministry of Science and Higher Education
3) 07/020/BKM20/0061 (BKM-514/RIB2/2022)
Shaping the properties of the surface layer of skeletal dentures made with incremental technology
Delivery time: 01. 01. 2020-31. 12. 2020
Project manager: mgr inż. Agata Sambok-Kiełbowicz
Opiekun: dr hab. inż. Witold Walke, prof. PŚ
Financing: Ministry of Science and Higher Education
4) 07/030/PBU16/2008 (PBU/20/RIB3/2016/505)
CONSORTIUM (partner) OPUS
New strategies for surface modification of metal implants for medical applications
UMO-2015/19/B/ST5/03431
Delivery time: 23. 09. 2016- 22. 04. 2020
Project manager: dr hab. inż. Janusz Szewczenko, prof. PŚ
Financing: National Science Center
5) 07/020/PBU19/0045
MINIATURE Development of physical and chemical properties of CoCrMo alloy for applications in the human urinary system
DEC-2018/02/X/ST8/03061
Delivery time: 01. 04. 2019- 31. 03. 2020
Project manager: dr inż. Wojciech Kajzer
Financing: National Science Center
6) 07/020/NB_19/0058 (NB-387/RIB2/2019)
Application of DLC coatings with increased abrasion resistance by the PVD method on elements of spine stabilizers made of Ti6AI4V alloy
Delivery time: 01. 12. 2019 -31. 05. 2020 r
Project manager: dr hab. inż. Witold Walke, prof. PŚ
7) 07/020/U__19/0057 (U-869/RIB2/2019)
Opinion on the innovation of an integrated set consisting of an intraoral scanner (digital 3D impression), a milling machine and a laptop with the necessary software
Delivery time: 17. 12. 2019-10. 01. 2020
Project manager: dr inż. Anna Ziębowicz
1) 07/020/NB_18/0036 (NB-267/RIB2/2018)
Development of a design, executive documentation and execution of a working prototype of a device for assessing the degree of wear of surgical drills
Delivery time: 09. 07. 2018 -31. 10. 2019
Project manager: dr inż. Marcin Basiaga
2) 07/020/BK_19/0050 (BK-242/RIB2/2019)
Shaping properties of biomaterials for tissue reconstruction
Delivery time: 01. 01. 2019-31. 12. 2019
Project manager: prof. dr hab. inż. Zbigniew Paszenda
Financing: Ministry of Science and Higher Education
3) 07/020/BKM19/0054 (BKM-536/RIB-2/2019)
Modification of the surface of oxide ceramics, including zircon, used as a filler for polymer-ceramic composites
Delivery time: 01. 01. 2019-31. 12. 2019
Project manager: dr inż. Damian Nakonieczny
Financing: Ministry of Science and Higher Education
4) 07/020/NB_19/0053 (NB-218/RIB2/2019)
Tests for self-twisting of locking screws from the plate – 16 pcs.
Delivery time: 18. 07. 2019-01. 08. 2019
Project manager: dr inż. Marcin Basiaga
5) 07/020/U__19/0043 (U-705/RIB2/2019)
Execution of an implementation opinion on innovation regarding medical equipment, i.e. a dental microscope and a surgical scaler that the company plans to purchase
Delivery time: 10. 01. 2019 -25. 01. 2019 r
Project manager: dr inż. Anna Ziębowicz
6) 07/020/U__19/0046 (U-725/RIB2/2019)
Assessment of the durability of the prosthesis bonding in the outflow cannula of the POLVAD-MED extracorporeal heart assist pump
Delivery time: 29. 03. 2019 -12. 04. 2019 r
Project manager: dr inż. Marcin Basiaga
7) 07/020/U__19/0047 (U-739/RIB2/2019)
Implementation of an implementation review for the Emerald intraoral scanner by Planmeca. The opinion is required to submit applications for the innovation of a medical device in order to obtain funding from the European Union
Delivery time: 10. 04. 2019-18. 04. 2019
Project manager: dr inż. Anna Ziębowicz
8) 07/020/U__19/0048 (U-741/RIB2/2019)
Preparation of an opinion on the innovation of the process in the subject of digitized implant prosthetic service
Delivery time: 17. 04. 2019-26. 04. 2019
Project manager: dr inż. Anna Ziębowicz
9) 07/020/U__19/0049 (U-748/RIB2/2019)
Opinion on innovation – digitization of the implantological and prosthetic services
Delivery time: 25. 04. 2019-30. 04. 2019
Project manager: dr inż. Anna Ziębowicz
10) 07/020/U__19/0051 (U-765/RIB2/2019)
Quality assessment tests for bone screws, 3.5 diameter, made of Ti6AI4V
Delivery time: 29. 05. 2019- 12. 06. 2019
Project manager: dr inż. Marcin Basiaga
11) 07/020/U__19/0052 (U-770/RIB2/2019)
Opinion on innovation for the project called Implementation of an innovative process of processing prosthetic materials using a simultaneous 5-axis milling machine with a linear magnetic drive and laser control of modeling parameters
Delivery time: 06. 06. 2019-21. 06. 2019
Project manager: dr inż. Anna Ziębowicz
1) 07/020/BK_18/0028 (BK-210/RIB2/2018)
Shaping properties of biomaterials for tissue reconstruction
Delivery time: 01. 01. 2018 -31. 12. 2018
Project manager: prof. dr hab. inż. Zbigniew Paszenda
Financing: Ministry of Science and Higher Education
2) 07/020/BKM18/0041 (BKM-540/RIB2/2018)
Functionalization of aluminosilicates used as a filler in polymer-ceramic composites
Delivery time: 01. 01. 2018- 31. 12. 2018
Project manager: dr inż. Damian Nakonieczny
Financing: Ministry of Science and Higher Education
3) 07/020/U__18/0029 (U-639/RIB-2/2018)
Assessment of the quality of slide shafts used for rolling bearings
Delivery time: 01. 02. 2018- 28. 02. 2018
Project manager: dr inż. Marcin Basiaga
4) 07/020/U__18/0030 (U-655/RIB-2/2018)
Opinion on the innovation of the laboratory of advanced CAD / CAM systems and the treatment station for the needs of innovative prosthetics and dental implantology at the Stencel Implantology and Dentistry Center
Delivery time: 27. 02. 2018- 06. 03. 2018
Project manager: dr inż. Damian Nakonieczny
5) 07/020/U__18/0031 (U-667/RIB2/2018)
Opinion on innovation required for the purchase of equipment planned by the company: laser, microscope and scanner, as an attachment to the company’s application for funding in the competition No. RPWM. 01.03.02-IP.03-28-001 / 18
Delivery time: 27. 03. 2018- 06. 04. 2018
Project manager: dr inż. Anna Ziębowicz
6) 07/020/U__18/0032 (U-684/RIB2/2018)
Preparation of a post-implementation opinion on innovation needed to settle the funding obtained under the Competition for Measure 3.2 Innovation in SMEs ROP voivodeship Silesian
Delivery time: 17. 05. 2018- 30. 05. 2018
Project manager: dr inż. Anna Ziębowicz
7) 07/020/U__18/0033 (U-704/RIB-2/2018)
Preparation of an implementation opinion to the application for co-financing the implementation of the project under the Regional Operational Program of the Śląskie Voivodeship for 2014-2020 (European Regional Development Fund)
Delivery time: 02. 07. 2018- 12. 07. 2018
Project manager: dr inż. Anna Ziębowicz
8) 07/020/U__18/0035 (U-710/RIB-2/2018)
Implementation of an implementation review for the Emerald intraoral scanner by Planmeca. The opinion is required to submit applications for the innovation of a medical device in order to obtain funding from the European Union
Delivery time: 26. 07. 2018- 10. 08. 2018
Project manager: dr inż. Anna Ziębowicz
9) 07/020/U__18/0037 (U-722/RIB2/2018)
Quality assessment tests for surgical tweezers
Delivery time: 05. 09. 2018- 21. 09. 2018
Project manager: dr hab. inż. Witold Walke, prof. PŚ
10) 07/020/U__18/0038 (U-728/RIB2/2018)
Quality assessment tests for surgical tweezers
Delivery time: 19. 09. 2018- 18. 10. 2018
Project manager: dr hab. inż. Witold Walke, prof. PŚ
11) 07/020/U__18/0040 (U-734/RIB2/2018)
Performing a quality test of surgical instruments, including chisels and surgical hooks
Delivery time: 27. 09. 2018- 05. 10. 2018
Project manager: dr inż. Marcin Basiaga
1) 07/020/BK_17/0022 (BK-201/RIB2/2017)
Shaping properties of biomaterials for tissue reconstruction
Delivery time: 01. 2017-31. 12. 2017
Project manager: prof. dr hab. Eng. Jan Marciniak
Financing: Ministry of Science and Higher Education
2) 07/020/BKM17/0025 (BKM-512/RIB2/2017)
Research on ceramic-polymer composites used in 3D printing systems
Delivery time: 05. 2017- 31. 12. 2017
Project manager: dr Eng. Damian Nakonieczny
Financing: Ministry of Science and Higher Education
3) 07/020/NB_17/0026 (NB-201/RIB-2/2017)
Anodic oxidation by PEO of Zr, Ti, and Zr-Mg coatings deposited on grade 2 titanium in Joanneum
Delivery time: 07. 2017- 30. 08. 2017
Project manager: dr hab. Eng. Janusz Szewczenko, prof. PŚ
4) 07/020/U__17/0024 (U-684/RIB-2/2017)
Polishing titanium samples for biocompatibility tests
Delivery time: 03. 2017- 29. 03. 2017
Project manager: dr Eng. Marcin Basiaga
5) 07/020/U__17/0027 (U-787/RIB-2/2017)
Performing a test to evaluate the durability of the connection of the cannula with the connector of the POLVAD-MEV pneumatic extracorporeal heart pump
Delivery time: 11. 2017-30. 11. 2017
Project manager: dr Eng. Marcin Basiaga
© Silesian University of Technology
The authors - the organizational units in which the information materials were produced, are fully responsible for the correctness, up-to-date and legal compliance with the provisions of the law. Hosted by: IT Center of the Silesian University of Technology (www@polsl.pl)
Rules for the use of "cookies" on the websites of the Silesian University of Technology
„E-Politechnika Śląska - utworzenie platformy elektronicznych usług publicznych Politechniki Śląskiej”